Since the closest period of time, sampling of content of deposit of area of the library before 75 section of the Liu Jiaxia reservoir that the worker of sanded class of water of plant of water and electricity of Home Liu gorge is 140 square kilometer in water area area undertakes the flood of complete library area, the relevant circumstance such as character of the composition that understands reservoir deposit content and silt grain further, distributinging configuration and rule, silt, master reservoir sanded affection first-hand data, the situation has done the danger that appears in the light of the likelihood to accuse measure beforehand ahead of schedule, had done sufficient preparation for the flood prevention this year.
Factory of water and electricity of Home Liu gorge is the first 1 billion made of baked clay class of Chinese large hydroelectric station, built in April 1969 generate electricity. Regard the backbone of northwest electrified wire netting as the enterprise, factory of water and electricity of Home Liu gorge is assuming electrified wire netting to move peak, frequency modulation and accident spare important task.